Case studies
Catherine House
We worked closely with the design team to check that the packages could be developed and tendered well in advance of the site works to ensure the scheme could be delivered with confidence…
Case studies
High Weald Academy
The new two and three storey academy building in Cranbrook, Kent is now one of the most state of the art learning environments in the area. 
Case studies
LSE New Academic Building
Early consultation with SOCOTEC Building Control Ltd enabled the application of a floor space factor within the floor area as with the effect of reducing the maximum occupancy of the…
Case studies
Random Dance Wayne McGregor Studio
SOCOTEC Building Control Ltd worked with the client team to ensure their aspirations were achieved.
Case studies
The Bunker Project
The new architecture was designed to insert and interweave into the existing structure, leaving the historic fabric (raw concrete) completely intact and uncontaminated as a volume.
Case studies
Royal Wharf Docklands
SOCOTEC Buidling Control Ltd provided building control for the prestigious Royal Wharf, Docklands, London development.  
Case studies
Coombe View
Blending the tradition of time-honoured construction methods with the sophistication of 21st-century materials, each of the exceptional homes reflects meticulous attention to detail.
Case studies
Canterbury House, Former Oxford Bus Station
Cantay acquired the old Bus Depot on Reliance Way in Oxford, once home and workplace of Henry Taunt, one of Victorian England’s most prolific photographers.
Case studies
Summit House
We are part of the team helping to deliver this prestigious low carbon refurbished office building in Euston Road.
Case studies
Project Heart
The Heart Building is an innovative staff well-being and quality assessment centre designed by LOM to encourage interaction, collaboration, and creativity at the heart of Tesco’s head…

Didn't find what you're looking for?

Contact us!